  • Egress window installation complete. (All 4 Windows)
  • Hose spigots installed per concept of rear patio from SE Michigan Rural Library Grant.
  • HVAC installing in progress. Ducted work on site and boring through walls needed for HVAC complete. Additional chase for duct work will be created on NE corner (shown in images).
  • Plumbing installation going well (mop sink and all water lines installed.)
  • Water well powered and pressurized. Will work on planning inspection from county for final approval.
  • Exterior brick washing planned (week of sept. 14th).
  • Exterior sealing and prep for painting in planning.
  • Locksets installed for all doors. Rekeying planned for locks and keys will be provided to the library.